Document Notice of Time Limit Suspension with Reasons

  • Project Marban Gold Mine Project
  • Document Category: Additional Information
  • Reference Number: 34
  • Document Date: 2024-10-23
  • Document: 159207E.html
  • Relevance: 336.02
  • Notice of Time Limit Suspension with Reasons Ottawa — October 23, 2024 — On February 8, 2023, the Impact Assessment Agency of Canada (IAAC) suspended the 180-day time limit within which it must provide Mining O3 Inc. (the proponent) with a notice of commencement of the impact assessment of the Marban Gold Mine Project, if IAAC decides that such an assessment is required. This suspension follows the submission of a written request (in French only) by the proponent to allow sufficient ...
1 alternate format found
French HTML
  • Relevance: 285.02
  • Avis de suspension du délai avec motifs Ottawa — 23 octobre 2024 — Le 8 février 2023, l'Agence d'évaluation d'l'impact du Canada (l'AEIC) a suspendu le délai de 180 jours au cours duquel elle doit fournir à Minière O3 (le promoteur) un avis de lancement de l'évaluation d'impact du projet minier aurifère Marban, si l'AEIC décide qu'une telle évaluation est requise. Cette suspension fait suite à la présentation par le promoteur d'une demande écrite afin de bénéficier de suffisamment de temps ...

Document Summary of Issues

  • Project Marban Gold Mine Project
  • Document Category: Additional Information
  • Reference Number: 28
  • Document Date: 2023-01-06
  • Document: 146262E.pdf
  • Relevance: 283.41
  • Summary of Issues – Marban Gold Mine Project The Summary of Issues summarizes the issues raised by the public and Indigenous peoples during the public consultation period on the summary of the Initial Project Description for the Marban Gold Mine Project (the Project) of O3 Mining Inc (the Proponent) that took place from December 1 to 21, 2022. Issues raised by federal authorities were also added to the document. All of these issues are drawn from comments submitted through ...
1 alternate format found
French PDF
  • Relevance: 232.41
  • Sommaire des questions – Projet minier aurifère Marban Le sommaire des questions résume les enjeux soulevés par le public et les peuples autochtones durant la période de consultation publique sur le résumé de la description initiale du projet minier aurifère Marban (le projet) de la Minière O3 (le promoteur) qui a eu lieu du 1er au 21 décembre 2022. Des enjeux soulevés par les autorités fédérales ont également été ajoutés au document. L’ensemble de ces enjeux sont tirés des ...

Document Public Notice - Comments Invited on the Summary of the Initial Project Description

  • Project Marban Gold Mine Project
  • Document Category: For Public Participation
  • Reference Number: 3
  • Document Date: 2022-12-01
  • Document: 145782E.html
  • Relevance: 280.9
  • Public Notice Marban Gold Mine Project Comments Invited on the Summary of the Initial Project Description Please note that the English information session scheduled for December 13, 2022, has been cancelled. What is happening? December 1, 2022 — O3 Mining Inc. (the proponent) is proposing the Marban Gold Mine Project, a new open pit gold mine located approximately 15 kilometers north-west of Val-d'Or, Quebec. The Impact Assessment Agency of Canada (the Agency) invites ...
1 alternate format found
French HTML
  • Relevance: 229.9
  • Avis public Projet minier aurifère Marban Période de consultation publique sur le résumé de la description initiale du projet Veuillez noter que la séance d'information en anglais prévue le 13 décembre 2022 est annulée. Que se passe-t-il? Le 1er décembre 2022 — La société Minière O3 (le promoteur) propose le projet minier aurifère Marban, une nouvelle mine d'or à ciel-ouvert située à environ 15 kilomètres au nord-ouest de Val-d'Or, au Québec. L'Agence d'évaluation ...

Document Summary of the Initial Project Description

  • Project Marban Gold Mine Project
  • Document Category: Additional Information
  • Reference Number: 2
  • Document Date: 2022-12-01
  • Document: 145673E.pdf
  • Relevance: 280.9
  • O3 MINING MARBAN MINING PROJECT SUMMARY OF THE INITIAL PROJECT DESCRIPTION NOVEMBER 2022 WSP Canada Inc. MARBAN MINING PROJECT SUMMARY OF THE INITIAL PROJECT DESCRIPTION O3 MINING FINAL VERSION PROJECT NO: 221-11330-03 DATE: NOVEMBER 2022 2E ÉTAGE 3535, BOULEVARD L.-P.-NORMAND TROIS-RIVIÈRES (QUÉBEC) G9B 0G8 CANADA T: +1 819 375-1292 WSP.COM MARBAN MINING PROJECT O3 MINING WSP NO 221-11330-03 PAGE I ...
1 alternate format found
French PDF
  • Relevance: 229.9
  • MINIÈRE O3 PROJET MINIER MARBAN INGÉNIERIE RÉSUMÉ DE LA DESCRIPTION INITIALE DE PROJET NOVEMBRE 2022 WSP Canada Inc. PROJET MINIER MARBAN INGÉNIERIE RÉSUMÉ DE LA DESCRIPTION INITIALE DE PROJET MINIÈRE O3 VERSION FINALE PROJET NO : 221-11330-03 DATE : NOVEMBRE 2022 2E ÉTAGE 3535, BOULEVARD L.-P.-NORMAND TROIS-RIVIÈRES (QUÉBEC) G9B 0G8 CANADA T : +1 819 375-1292 WSP.COM PROJET MINIER MARBAN INGÉNIERIE MINIÈRE O3 ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Result Type Display Filters

Key Document Display Filters

Date modified: