GCT Deltaport Expansion - Berth Four Project

Registry Search Mobile

Registry Search

Skip to Filters

44 results

Document Notice of the Establishment of Time Limits with Reasons

  • Project GCT Deltaport Expansion - Berth Four Project
  • Document Category: Additional Information
  • Reference Number: 306
  • Document Date: 2024-09-20
  • Document: 159133E.html
  • Relevance: 333.52
  • Notice of the Establishment of Time Limits with Reasons Ottawa – September 20, 2024 –  The Impact Assessment Agency of Canada is posting this Notice of Establishment of Time Limits with Reasons in Accordance with the Notice of Transition. Ottawa – September 20, 2024 – The Impact Assessment Agency of Canada (IAAC) has established an overall time limit of 600 days for the Impact Assessment Phase for the proposed GCT Deltaport Expansion - Berth Four Project (the project). On May ...
1 alternate format found
French HTML
  • Relevance: 282.52
  • Avis d'établissement de délais avec motifs 20 septembre 2024 : L'Agence d'évaluation d'impact du Canada publie cet avis d'établissement de délais avec motifs conformément à l'avis de transition. Ottawa – le 20 septembre 2024 – L'Agence d'évaluation d'impact du Canada (l'AEIC) a établi un délai global de 600 jours pour l'étape de l'évaluation de l'impact du projet d'agrandissement de Deltaport - quatrième poste d'amarrage (le projet). Le projet est proposé par GCT Canada Limited ...

Document Notice of Transition to the Amended Impact Assessment Act

  • Project GCT Deltaport Expansion - Berth Four Project
  • Document Category: Additional Information
  • Reference Number: 303
  • Document Date: 2024-09-20
  • Document: 158497E.html
  • Relevance: 333.52
  • Notice of Transition to the Amended Impact Assessment Act   Ottawa – September 20, 2024 – On June 20, 2024, the Budget Implementation Act, 2024, No. 1 received Royal Assent and brought into force amendments to the Impact Assessment Act (the IAA). Transitional provision 305 of the Budget Implementation Act, 2024, No. 1 states that in order to bring a designated project under the IAA, the Minister of Environment and Climate Change or the Impact Assessment Agency of Canada (IAAC) must take ...
1 alternate format found
French HTML
  • Relevance: 282.52
  • Avis de transition vers la Loi sur l'évaluation d'impact modifiée   Ottawa – Le 20 septembre, 2024 – Le 20 juin 2024, la Loi no 1 d'exécution du budget de 2024 a reçu la sanction royale et est entrée en vigueur des modifications à la Loi sur l'évaluation d'impact (la LEI). La disposition transitoire 305 de la Loi no 1 d'exécution du budget de 2024 stipule que pour faire en sorte qu'un projet désigné soit visé par la LEI, la ministre de l'Environnement et du Changement climatique ou ...

Document Draft Review Panel Terms of Reference

  • Project GCT Deltaport Expansion - Berth Four Project
  • Document Category: Additional Information
  • Reference Number: 234
  • Document Date: 2023-02-28
  • Document: 146776E.pdf
  • Relevance: 287.55
  • GCT Deltaport Expansion – Berth Four Project Review Panel Terms of Reference DRAFT VERSION FOR CONSULTATION February 28, 2023 REVIEW PANEL TERMS OF REFERENCE – GCT DELTAPORT EXPANSION - BERTH FOUR PROJECT Page 2 of 17 TABLE OF CONTENTS 1. Introduction .................................................................................................................. 3 2. Description of the Project ...
1 alternate format found
French PDF
  • Relevance: 236.55
  • Projet d’agrandissement de Deltaport — quatrième poste d’amarrage Mandat de la commission d’examen VERSION PROVISOIRE À DES FINS DE CONSULTATION 28 février 2023 MANDAT DE LA COMMISSION D’EXAMEN — PROJET D’AGRANDISSEMENT DE DELTAPORT — QUATRIÈME POSTE D’AMARRAGE Page 2 sur 17 TABLE DES MATIÈRES 1. Introduction .................................................................................................................. 3 2. Description du projet ...

Document Comment Template

  • Project GCT Deltaport Expansion - Berth Four Project
  • Document Category: Additional Information
  • Reference Number: 232
  • Document Date: 2023-02-28
  • Document: 146774E.docx
  • Relevance: 287.55
  • Comment Template for the Review Panel Terms of Reference and the Canada-British Columbia Cooperation Agreement for the GCT Deltaport Expansion – Berth Four Project This comment template has been prepared to guide your review of the following documents: · Draft Canada-British Columbia Cooperation Agreement on the Coordination of the Environmental and Impact Assessment Processes for the GCT Deltaport Expansion – Berth Four Project (Cooperation Agreement): describes how the Impact Assessment ...
1 alternate format found
French DOCX
  • Relevance: 236.55
  • Formulaire de commentaire pour le mandat de la commission d'examen et Entente de collaboration entre le Canada et la Colombie-Britannique pour le Projet d'agrandissement de Deltaport – quatrième poste d’amarrage Ce formulaire de commentaire a été préparé pour guider votre examen des documents suivants : · Entente de collaboration entre le Canada et la Colombie-Britannique relative à la coordination des processus d’évaluation environnementale et d’évaluation d’impact pour le projet ...

Document GCT Deltaport Expansion - Berth Four Project - Public Comment Period and Information Sessions

  • Project GCT Deltaport Expansion - Berth Four Project
  • Document Category: For Public Participation
  • Reference Number: 235
  • Document Date: 2023-02-28
  • Document: 146777E.html
  • Relevance: 287.55
  • Public Notice GCT Deltaport Expansion – Berth Four Project Public Comment Period and Information Sessions The Impact Assessment Agency of Canada (the Agency) and British Columbia's Environmental Assessment Office (EAO) are conducting a cooperative assessment of the GCT Deltaport Expansion - Berth Four Project. GCT Canada Limited Partnership is proposing to expand the existing GCT Deltaport Container Terminal, a container storage and handling facility located in Delta, British ...
1 alternate format found
French HTML
  • Relevance: 236.55
  • Avis public Projet d'agrandissement de Deltaport - quatrième poste d'amarrage Période de consultation publique et séances d'information L'Agence d'évaluation d'impact du Canada (AEIC) et le Bureau d'évaluation environnementale (BEE) de la Colombie-Britannique procèdent à une évaluation collaborative du projet d'agrandissement de Deltaport – quatrième poste d'amarrage. GCT Canada Limited Partnership propose d'agrandir son terminal à conteneurs GCT Deltaport actuel, une installation ...

Document Joint Indigenous Engagement and Partnership Plan

  • Project GCT Deltaport Expansion - Berth Four Project
  • Document Category: Additional Information
  • Reference Number: 208
  • Document Date: 2022-05-31
  • Document: 155440E.html
  • Relevance: 268.98
  • Joint Indigenous Engagement and Partnership Plan GCT Deltaport Expansion – Berth Four Project (DP4) May 31, 2022 Final Version Contents Contents List of Figures List of Tables Glossary 1. Introduction 2. Description of the Proposed Project 3. Objectives of Indigenous Engagement and Partnership 4. Indigenous Nations 4.1 Crown Consultation List of Indigenous Nations 4.2 Additional Indigenous Communities and Tribes of Washington ...
3 alternate formats found
English PDF
  • Relevance: 268.98
  • Joint Indigenous Engagement and Partnership Plan GCT DELTAPORT EXPANSION – BERTH FOUR PROJECT (DP4) May 31, 2022 FINAL VERSION IMPACT ASSESSMENT AGENCY OF CANADA / B.C . ENVIRONMENTAL ASSESSMENT OFFICE GCT DELTAPORT EXPANSION – BERTH FOUR PROJECT (DP4) – JOINT INDIGENOUS ENGAGEMENT AND PARTNERSHIP PLAN I I Contents Contents ...
French PDF
  • Relevance: 217.98
  • Plan conjoint de mobilisation et de partenariat avec les Autochtones PROJET D’AGRANDISSEMENT DE DELTAPORT — QUATRIÈME POSTE D’AMARRAGE 31 mai 2022 VERSION FINALE A GE NCE D ’ É V A LUA T IO N D ’ IM P A CT DU CA NA DA / E N V IR O NM E NT A L A S S E S S M E NT OF F ICE DE LA C .B . PROJET D’AGRANDISSEMENT DE DELTAPORT — QUATRIÈME POSTE D’AMARRAGE — PLAN CONJOINT DE MOBILISATION ET DE PARTENARIAT AVEC LES AUTOCHTONES I I ...
French HTML
  • Relevance: 217.98
  • Plan conjoint de mobilisation et de partenariat avec les Autochtones Projet d'agrandissement de Deltaport — quatrième poste d'amarrage 31 mai 2022 Version finale Contenu Contenu Liste des figures Liste des tableaux Glossaire 1. Introduction 2. Description du projet proposé 3. Objectifs de la mobilisation et du partenariat avec les Autochtones 4. Nations autochtones 4.1 Liste des nations autochtones visées par les consultations de la ...

Document Joint Guidelines (Updated September 1, 2022)

  • Project GCT Deltaport Expansion - Berth Four Project
  • Document Category: Additional Information
  • Reference Number: 206
  • Document Date: 2022-05-31
  • Document: 143950E.pdf
  • Relevance: 268.98
  • Joint Guidelines GCT DELTAPORT EXPANSION – BERTH FOUR PROJECT (DP4) Original Posting: May 31, 2022 Updated: September 1, 2022 FINAL VERSION IMPACT ASSESSMENT AGENCY OF CANADA / B.C . ENVIRONMENTAL ASSE SSMENT OFFICE GCT DELTAPORT EXPANSION – BERTH FOUR PROJECT (DP4) – JOINT GUIDELINES I I Contents List of Tables ........................................................................................................... xi ...
3 alternate formats found
English HTML
  • Relevance: 268.98
  • Joint Guidelines GCT Deltaport Expansion - Berth Four Project (DP4) May 31, 2022 (Updated September 1, 2022) Final Version Contents List of Tables List of Figures List of Appendices List of Abbreviations and Acronyms Symbols and Units of Measure Glossary Disclaimer Preface 1. Project Introduction and Overview 1.1. Proponent Information 1.2. Project Location 1.3. Matters and Factors to Be Considered in the ...
French PDF
  • Relevance: 217.98
  • Lignes directrices conjointes PROJET D’AGRANDISSEMENT DE DELTAPORT – QUATRIÈME POSTE D’AMARRAGE (DP4) 31 mai 2022 VERSION FINALE AGE NC E D’É VAL U ATIO N D ’ I MPA CT D U CA NA DA / E NV I RO NM ENT AL AS SES SM ENT OFF IC E DE LA C. -B . PROJET D’AGRANDISSEMENT DE DELTAPORT – QUATRIÈME POSTE D’AMARRAGE (DP4) – LIGNES DIRECTRICES CONJOINTES I I Table des matières Liste des tableaux ...
French HTML
  • Relevance: 217.98
  • Lignes directrices conjointes Projet d'agrandissement de Deltaport – quatrième poste d'amarrage (DP4) 31 mai 2022 Version finale Table des matières Liste des tableaux Liste des figures Liste des annexes Liste des sigles et acronymes Symboles et unités de mesure Glossaire Avis de non-responsabilité Préface 1. Introduction et aperçu du projet 1.1. Informations sur le promoteur 1.2. Emplacement du projet 1.3. Questions et ...

Document Notice of Commencement of an Impact Assessment

  • Project GCT Deltaport Expansion - Berth Four Project
  • Document Category: Additional Information
  • Reference Number: 210
  • Document Date: 2022-05-31
  • Document: 144146E.html
  • Relevance: 268.98
  • Notice of Commencement of an Impact Assessment Ottawa – May 31, 2022 – The Impact Assessment Agency of Canada (the Agency) has commenced an impact assessment pursuant to the Impact Assessment Act (IAA) for the GCT Deltaport Expansion – Berth Four Project (the Project). On November 3, 2021, the Honourable Steven Guilbeault, Minister of the Environment and Climate Change, referred the impact assessment of the Project to an independent review panel. The Agency has issued the Joint ...
1 alternate format found
French HTML
  • Relevance: 217.98
  • Avis de lancement d'une évaluation d'impact Ottawa – le 31 mai 2022 – L'Agence d'évaluation d'impact du Canada (l'Agence) a entamé une évaluation d'impact en vertu de la Loi sur l'évaluation d'impact (LEI) pour le projet d'agrandissement de Deltaport – quatrième poste d'amarrage (le projet).  Le 3 novembre 2021, l'honorable Steven Guilbeault, ministre de l'Environnement et du Changement climatique, a renvoyé l'étude d'impact du projet à une commission d'examen indépendante. L'Agence a ...

Document Joint Assessment Plan

  • Project GCT Deltaport Expansion - Berth Four Project
  • Document Category: Additional Information
  • Reference Number: 207
  • Document Date: 2022-05-31
  • Document: 143951E.pdf
  • Relevance: 268.98
  • Joint Assessment Plan GCT DELTAPORT EXPANSION – BERTH FOUR PROJECT (DP4) May 31, 2022 FINAL VERSION IMPACT ASSESSMENT AGENCY OF CANADA / B.C . ENVIRONMENT AL ASSESSMENT OFFICE GCT DELTAPORT EXPANSION – BERTH FOUR PROJECT (DP4) – JOINT ASSESSMENT PLAN I I Contents Glossary ...
3 alternate formats found
English HTML
  • Relevance: 268.98
  • Joint Assessment Plan GCT Deltaport Expansion – Berth Four Project (DP4) May 31, 2022 Final Version Contents Glossary 1. Introduction 1.1. Project Background 1.2. Purpose of the Plan 2. Approach to Cooperation 2.1. Cooperation Agreement 2.2. Cooperation Opportunities 3. Indigenous Engagement 4. Public Participation 5. Assessment Process 5.1. Impact Statement Development and Review Phase 5.2. Impact ...
French PDF
  • Relevance: 217.98
  • Plan conjoint d'évaluation PROJET D'AGRANDISSEMENT DE DELTAPORT - QUATRIÈME POSTE D’AMARRAGE 31 mai 2022 VERSION FINALE AGE NC E D ’É VAL UAT IO N D’ I MPA CT D U CA NA DA / E NV I RO NM ENT AL AS SES SM ENT OFF IC E DE LA C.B . PROJET D’AGRANDISSEMENT DE DELTAPORT – QUATRIÈME POSTE D’AMARRAGE - PLAN CONJOINT D'ÉVALUATION 2 Contenu Plan conjoint d'évaluation ...
French HTML
  • Relevance: 217.98
  • Plan conjoint d'évaluation Projet d'agrandissement de Deltaport - Quatrième poste d'amarrage 31 mai 2022 Version finale Contenu Glossaire 1. Introduction 1.1. Contexte du projet 1.2. Objectif du plan 2. Approche de la coopération 2.1. Accord de coopération 2.2. Opportunités de coopération 3. Engagement autochtone 4. Participation du public 5. Processus d'évaluation 5.1. Phase d'élaboration et d'examen de ...

Document Joint Permitting and Regulatory Coordination Plan

  • Project GCT Deltaport Expansion - Berth Four Project
  • Document Category: Additional Information
  • Reference Number: 209
  • Document Date: 2022-05-31
  • Document: 143953E.pdf
  • Relevance: 268.98
  • Joint Permitting / Regulatory Coordination Plan GCT DELTAPORT EXPANSION – BERTH FOUR PROJECT (DP4) May 31, 2022 FINAL VERSION IMPACT ASSESSMENT AGENCY OF CANADA / B.C . ENVIRONMENT AL ASSESSMENT OFFICE GCT DELTAPORT EXPANSION – BERTH FOUR PROJECT (DP4) – JOINT PERMITTING / REGULATORY COORDINATION PLAN 2 1. Introduction 1.1 Project Background GCT Canada Limited Partnership (the proponent) is proposing to expand its ...
3 alternate formats found
English HTML
  • Relevance: 268.98
  • Joint Permitting / Regulatory Coordination Plan GCT Deltaport Expansion – Berth Four Project (DP4) May 31, 2022 Final Version 1. Introduction 1.1 Project Background GCT Canada Limited Partnership (the proponent) is proposing to expand its existing GCT Deltaport Container Terminal, a container storage and handling facility located in Delta, British Columbia. The GCT Deltaport Expansion – Berth Four Project (the project) would add a fourth berth on the east side of the ...
French PDF
  • Relevance: 217.98
  • Plan de délivrance de permis et de coordination réglementaire PROJET D’AGRANDISSEMENT DE DELTAPORT — QUATRIÈME POSTE D’AMARRAGE 31 mai 2022 VERSION FINALE AGENCE D’ÉVALUATION D’ IMPACT DU CANADA / BUREAU D’ÉVALUATION ENVIRONNEMENT ALE DE LA C-B. PROJET D’AGRANDISSEMENT DE DELTAPORT — QUATRIÈME POSTE D’AMARRAGE — PLAN DE DÉLIVRANCE DE PERMIS ET DE COORDINATION RÉGLEMENTAIRE 2 1. Introduction 1.1 Contexte du projet GCT Canada ...
French HTML
  • Relevance: 217.98
  • Plan de délivrance de permis et de coordination réglementaire Projet d'agrandissement de Deltaport — quatrième poste d'amarrage 31 mai 2022 Version finale 1. Introduction 1.1 Contexte du projet GCT Canada Limited Partnership (le promoteur) propose d'agrandir son terminal à conteneurs GCT Deltaport actuel, une installation d'entreposage et de manutention de conteneurs située à Delta, en Colombie-Britannique. Le projet d'agrandissement de Deltaport — quatrième poste ...

Document Notice of Referral to Review Panel

  • Project GCT Deltaport Expansion - Berth Four Project
  • Document Category: Additional Information
  • Reference Number: 76
  • Document Date: 2021-11-03
  • Document: 141728E.html
  • Relevance: 256.29
  • Notice of Referral to Review Panel Ottawa — November 3, 2021 — The Honourable Steven Guilbeault, Minister of the Environment and Climate Change, has referred the impact assessment of the GCT Deltaport Expansion – Berth Four Project (the Project) to an independent review panel. As per section 36 of the Impact Assessment Act, the Minister may refer the impact assessment of a project to a review panel if it is in the public interest to do so, by considering the following ...
1 alternate format found
French HTML
  • Relevance: 205.29
  • Avis de renvoi à une commission d'examen Ottawa — 3 novembre 2021 — L'honorable Steven Guilbeault, Ministre de l'Environnement et du Changement climatique, a renvoyé l'évaluation d'impact pour le projet d'agrandissement de Deltaport – quatrième poste d'amarrage (le projet) à une commission d'examen indépendante. Conformément à l'article 36 de la Loi sur l'évaluation d'impact, le ministre peut renvoyer l'évaluation d'impact du projet à une commission d'examen, s'il estime qu'il est dans ...

Document Summary of the Detailed Project Description (see reference #201)

  • Project GCT Deltaport Expansion - Berth Four Project
  • Document Category: Additional Information
  • Reference Number: 71
  • Document Date: 2021-10-28
  • Document: 141688E.pdf
  • Relevance: 255.94
  • Global Container Terminals | GCT Deltaport Expansion, Berth Four Project (DP4) | Summary of the Detailed Project Description | October 2021 Summary of the Detailed Project Description October 2021 Submission to the Impact Assessment Agency of Canada Submitted by GCT with expert input provided by its advisors. Global Container Terminals | GCT Deltaport Expansion, Berth Four Project (DP4) | Summary of the Detailed Project Description | October 2021 i ACRONYMS AND ABBREVIATIONS ...
1 alternate format found
French PDF
  • Relevance: 204.94
  • Global Container Terminals | Agrandissement de GCT Deltaport | Projet de quatrième poste d’amarrage (DP4) | Résumé de la description détaillée du projet | Octobre 2021 Résumé de la description détaillée du projet Octobre 2021 Proposition à l’Agence d’évaluation d’impact du Canada Déposée par GCT avec l’aide de ses experts-conseils GLOBAL CONTAINER TERMINALS AGRANDISSEMENT DE DELTAPORT PROJET DE QUATRIÈME POSTE D’AMARRAGE (DP4) Global Container Terminals | Agrandissement de GCT ...

Document Notice of Impact Assessment Decision with Reasons

  • Project GCT Deltaport Expansion - Berth Four Project
  • Document Category: Additional Information
  • Reference Number: 72
  • Document Date: 2021-10-28
  • Document: 141689E.html
  • Relevance: 255.94
  • Notice of Impact Assessment Decision with Reasons Ottawa — October 28, 2021 — The Impact Assessment Agency of Canada (the Agency) has decided that an impact assessment is required for the GCT Deltaport Expansion - Berth Four Project (the Project) located in Delta, British Columbia. In accordance with subsection 16(2) of the Impact Assessment Act (IAA), the Agency has taken into account each of the following factors: the proponent's Detailed Project Description, and its response ...
1 alternate format found
French HTML
  • Relevance: 204.94
  • Avis de décision d'évaluation d'impact avec motifs Ottawa — le 28 octobre — L'Agence d'évaluation d'impact du Canada (l'Agence) a décidé qu'une évaluation d'impact est requise pour le projet d'agrandissement de Deltaport – quatrième poste d'amarrage (le projet) situé à Delta, en Colombie-Britannique. Conformément au paragraphe 16(2) de la Loi sur l'évaluation d'impact (LEI), l'Agence a tenu compte de chacun des facteurs suivants : la description détaillée du projet par le ...

Document Joint Summary of Issues and Engagement

  • Project GCT Deltaport Expansion - Berth Four Project
  • Document Category: Additional Information
  • Reference Number: 61
  • Document Date: 2020-12-23
  • Document: 137278E.pdf
  • Relevance: 239.63
  • - 2 - The guidelines for completing a Detailed Project Description for the EAO are included in the Early Engagement Policy. Under Section 39(a) of the provincial Environmental Assessment Act (2018), GCT has up to one year to submit its Detailed Project Description from the issuance of the Joint Summary or the Chief Executive Assessment Officer may terminate the assessment of the Project. The EAO notes that the Detailed Project Description is a foundational document for Process ...
1 alternate format found
French PDF
  • Relevance: 188.63
  • Région du Pacifique et du Yukon Pacific and Yukon Region C.P. 9426 Stn Prov Govt 757 rue Hastings Ouest 757 West Hastings Street Victoria (C.-B.) V8W 9V1 Bureau 210 A Suite 201A Vancouver (C.-B.) V6C 3M2 Vancouver BC V6C 3M2 Le 23 décembre 2020 Envoi par courriel seulement Monsieur Mike McLellan Vice-président, Développement de projets GCT Canada Limited Partnership mmclellan@globalterminals.com Numéro de dossier de l’Agence : 81010 Numéro de dossier ...

Document Summary of an Initial Project Description of a Designated Project

  • Project GCT Deltaport Expansion - Berth Four Project
  • Document Category: Additional Information
  • Reference Number: 2
  • Document Date: 2020-09-18
  • Document: 136130E.pdf
  • Relevance: 235.14
  • ...
1 alternate format found
French PDF
  • Relevance: 184.14
  • Résumé de la description initiale du projet 18 septembre 2020 Proposition conjointe à l’Agence d’évaluation d’impact du Canada et au Bureau d’évaluation environnementale de la Colombie-Britannique Soumis par GCT avec l’expertise de ses conseillers GLOBAL CONTAINER TERMINALS AGRANDISSEMENT DE DELTAPORT PROJET DE QUATRIÈME POSTE D’AMARRAGE (DP4) Global Container Terminals | Agrandissement de Deltaport | Projet de quatrième poste d’amarrage (DP4) | Résumé – Description initiale du ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Result Type Display Filters

Key Document Display Filters

Date modified: