Search Registry

Registry Search Mobile

Registry Search

Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

Skip to Filters

415 results

Project Construction of a service building in the parking lot of the Cap-des-Rosiers Beach

  • Location (Forillon National Park, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80774
  • Last Modified: 2020-07-08
  • The service building is a sanitary building. Some clearing is necessary for the construction. The water supply for the building will be provided by a well to be built on a piece of land in the Park, either north of provincial highway 132 or near the building. A Bionest- or Ecoflo-type system will be built for water treatment.

Project Install Beaver Control Structures, South Escarpment Stillwaters

  • Location (South Escarpment Stillwaters Site at 5 Wing Goose Bay in Happy Valley- Goose Bay, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80825
  • Last Modified: 2020-07-07
  • In 2017, construction of engineered wetlands at the South Escarpment Stillwaters Site at 5 Wing Goose Bay in Happy Valley- Goose Bay (HVGB) was completed. Since project completion, beaver populations have interfered with the intended water levels within the constructed engineered wetlands, flooding the areas and preventing intended plant growth. To address this issue and prevent future occurrences, a new project is proposed to install a Flexible Leveler waterflow device within an existing ...

Project Columbia Containers Shoreline Protection Repair

  • Location (Columbia Containers Shoreline Protection Repair, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80824
  • Last Modified: 2020-07-06
  • Vancouver Fraser Port Authority, (the Applicant) is proposing to conduct repairs to approximately 600 metres of existing shoreline protection infrastructure along the foreshore of the leased property at 2319 Commissioner Street, Vancouver, B.C. The project consists of the removal and disposal of woody and other organic debris and concrete slabs, salvage of existing rip rap, and import of new materials to the site. The Applicant proposes to place armour rock, filter rock and gravel over ...

Project Nepean Point Redevelopment

  • Location (Ottawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80522
  • Last Modified: 2020-07-06
  • The National Capital Commission is leading the Nepean Point Redevelopment project, which is based on the winning design of an International Landscape Design Competition held in 2017 by the National Capital Commission.  Beginning with a June 2014 visioning and design workshop, and continuing into October 2017 with proposal presentations by the Design Competition finalists, stakeholder groups and members of the community have been able to help define key goals of the Redevelopment ...

Project Milton Logistics Hub Project

  • Location (Milton, Ontario)
  • Assessment Type: Environmental assessment by Review Panel under CEAA 2012
  • Status: In progress
  • Reference Number: 80100
  • Last Modified: 2020-07-06
  • The Canadian National Railway Company is proposing the construction and operation of a logistics hub, designed to transfer containers between trucks and railcars. The project would include a railway yard with more than 20 kilometres of track and be located in Milton, Ontario, about 50 kilometres west of Toronto.

Project BHP Canada Exploration Drilling Project

  • Location (325 kilometres northeast of St. John's, Newfoundland and Labrador)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80174
  • Last Modified: 2020-07-06
  • BHP Petroleum (New Ventures) Corporation is proposing to conduct an exploration drilling project within offshore exploration licences in the Orphan Basin, located approximately 350 kilometres northeast of St. John's, Newfoundland and Labrador in the Atlantic Ocean. As proposed, the BHP Canada Exploration Drilling Project would allow the proponent, over an eight-year period, to determine the presence, nature, and quantities of the potential hydrocarbon resource in exploration ...

Project Fortis Line Install at CP Mile 108

  • Location (Banff National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80763
  • Last Modified: 2020-07-04
  • This project will be assessed with a basic impact assessment. Fortis is proposing to install a new 250m right-of-way to power signal lights on the CP rail tracks. The land is currently undeveloped. They propose horizontal directional drilling to underground the line, which will pass perpendicular to the Bow Valley Parkway near Baker Creek.

Project Decommissioning of Tenaille Lake Water Infrastructure

  • Location (Tenaille Lake, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80821
  • Last Modified: 2020-07-03
  • Project proposes to decommission abandoned irrigation infrastructure at Tenaille Lake.  Project will involve the decommissioning of inlet canals, ditches and dikes; the removal of water control structures like gates and corrugated steel pipe; and site revegetation.  No in-water work is required as part of this project.  This infrastructure has been abandoned for many years and needs to be removed.  The area was more recently operated as part of the Community Pasture ...

Project Gazoduq Project

  • Location (Near Ramore, Ontario) (Saguenay Region, Quebec)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 80264
  • Last Modified: 2020-07-03
  • Gazoduq Inc. is proposing the construction and operation of a natural gas pipeline approximately 780 kilometres long between northeastern Ontario and Saguenay, Quebec. This proposed project would connect TC Energy Limited's existing main natural gas transmission system in northeastern Ontario to the proposed Énergie Saguenay Project, a natural gas liquefaction facility by GNL Québec in Saguenay, Québec. The project would also include three compressor stations, one ...

Project Fenceline Construction and Maintenance at Richmond Training Area

  • Location (Colonel Sherman Armoury and Richmond Training Area, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80820
  • Last Modified: 2020-07-02
  • A fence is required around the perimeter of the Richmond training area. The proposed fence installation and maintenance will be a two-part project. For the fence line construction, a 4 metre swath of vegetation along the property line will be cleared. Low spots will be raised so that the fence is even height and in a straight line which increases its effectiveness at restricting access. Straining posts with concrete footings will be installed every 30 metres, or where there is a change in ...

Project Waywayseecappo First Nation Elton Property Gas Bar

  • Location (Waywayseecappo First Nation, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80819
  • Last Modified: 2020-07-02
  • Project Summary:  The Waywayseecappo First Nation purchased the referred to property with the intent of converting to reserve status and for commercial purposes. The First Nation did a clean up of the site and replaced with a gravel pad. The property was surveyed, and a phase one environmental assessment was completed. Most existing structures have been removed and discarded by the contractor engaged to provide the demolition. On completion of the negotiation with the Province of Manitoba ...

Project Fraser Mills Pile Removal

  • Location (Fraser Mills Pile Removal, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80755
  • Last Modified: 2020-07-02
  • Beedie Development in care of Fraser Mills Properties Ltd. proposes to remove approximately 300 creosote treated timber piles from the Fraser River fronting River Front Park in Coquitlam. The piles will be removed from a previous log storage area to make-way for shoreline improvements associated with an upland development. The works are proposed to be conducted by barge with vibratory and cable extraction. Deteriorated piles, that cannot be removed by extraction, are proposed to be cut at the ...

Project Summer guided activities by business license holders for Gros Morne National Park

  • Location (Gros Morne National Park, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80753
  • Last Modified: 2020-07-02
  • A business licensing system for summer guided/outfitter activities in Gros Morne National Park will be in place by fall 2020. All current and anticipated summer guiding activities will be assessed in an Impact Assessment, which will be appended to each business license and will identify specific mitigations for each type of guiding activity. Summer guiding activities are varied and will take place in a wide range of locations throughout the park from spring to fall. The proposed guiding ...

Project Parking Lot Expansion and Resurfacing

  • Location (Richibucto, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80719
  • Last Modified: 2020-07-01
  • The project includes reviewing the existing parking lot to address the existing concerns with current condition of the asphalt pavement.   The parking lot investigation will also look to increase the current parking capacity at the detachment.  In order to accomplish this, tree removal may be required as well as plant pot relocation to accommodate the extension of the existing walkway.  The existing light standards may also need to be relocated and the luminaires will be ...

Project Reconstruction of a Section of York Road and Rehabilitation of the Mud Creek Bridge

  • Location (Reconstruction of a Section of York Road and Rehabilitation of the Mud Creek Bridge, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80747
  • Last Modified: 2020-07-01
  • The Project consists of the reconstruction of York Road from Shannonville Road to Norways Road, and the rehabilitation the Mud Creek Bridge road in Tyendinaga Mohawk Territory, Ontario. The scope of the Project includes reconstructing five (5) kilometres of road by removing the existing surface, upgrading the sub-base and curbs, replacing deficient culverts, improving ditching, and paving the road surface and shoulders. Bridge work will involve repairing girder ends, replacing the concrete and ...

Project Stabilization of four stormwater outfalls, Unamen Shipu

  • Location (Unamen Shipu, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80730
  • Last Modified: 2020-07-01
  • The project consists of repairing four stormwater outfalls and stabilizing the embankment using permanent riprap to reduce erosion at the outlet of the four culverts flowing into the Gulf of St. Lawrence, at the mouth of the Romaine River, in Unamen Shipu (La Romaine). The work will be conducted at the coves USC (outfalls 1 to 3) and USD (outfall 4). At the embankment toe, this project will encroach a total of 13.82 m² of fish habitat, principally at the outfall 3 (13.78 m²). The ...

Project Improvements to Two Roads in Sheshagwaning First Nation

  • Location (Improvements to Two Roads in Sheshagwaning First Nation, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80748
  • Last Modified: 2020-07-01
  • Improved and / or more reliable road asset Project is for the realignment and upgrading of approximately 3.1 kilometres of Shigniconing Road and Sheshegwaning Road, from the Sheshegwaning landfill site to the border with Zhiibaahaasing First Nation. The work includes: elimination of two very sharp curves; improvements to sightlines, drainage and the road base; and hard surfacing of the roads. Improve public safety and reduce road maintenance costs

Project Western Canadian Marine Response Corporation (WCMRC) Saanich Base

  • Location (Victoria International Airport (YYJ), British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80714
  • Last Modified: 2020-06-30
  • The project involves the construction of a spill response facility which includes a shop, warehouse, offices, staff facility areas. Schedule: Aug 2020- Oct 2021. Construction activities will generally occur during normal business hours; however, some night work may be required. Types of activity include survey, site preloading, civil work, structural steel erecting, mechanical, electrical, crane work, and general materials handling. The project is located groundside on the northeast ...

Project Sipekne'katik Diversion Centre

  • Location (Sipekne'katik First Nation, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80816
  • Last Modified: 2020-06-30
  • The diversion centre will supplement existing waste collection services offered within the community and not replace these services. The diversion centre will allow community members to drop off waste, such as construction and demolition (C&D) debris, household hazardous waste (HHW) (e.g., paint, used oil, batteries), bulky items (e.g., furniture, mattresses), small amounts of garbage, and recyclables collected as part of the existing curbside program.  The center will be built on a ...

Project Titan Boats Construction of a Boat Manufacturing Facility

  • Location (Victoria International Airport (YYJ), British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80703
  • Last Modified: 2020-06-30
  • Project Type: Construction of a Boat Manufacturing Facility Proponents: Daneco Holdings Ltd Authority: Victoria Airport Authority (VAA) Location: Victoria International Airport (YYJ) – Sidney BC Schedule: June 2020- June 2021 The project involves the construction of a manufacturing facility which includes a fabrication shop, offices and staff facility areas. Construction activities will generally occur during normal business hours; however, some night work may be ...

Project Metro Vancouver - Conveyance for North Vancouver Wastewater Treatment Plant Amendment

  • Location (Metro Vancouver - Conveyance for North Vancouver Wastewater Treatment Plant Amendment, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80814
  • Last Modified: 2020-06-30
  • Under Project and Environmental Review No. 17-090, the port authority approved the conveyance for the new North Shore Wastewater Treatment Plant in West Vancouver. The proposed permit amendment would involve extending Permit 17-090, which currently expires on December 30, 2020 to December 31, 2021 to adhere with Covid-19 restrictions and subsequent delays to the project schedule. The extension to the permit duration does not change the footprint or scope of the project, or any other conditions ...

Project YMX International Aerocity of Mirabel - Extension of an industrial building

  • Location (YMX International Aerocity of Mirabel, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80536
  • Last Modified: 2020-06-30
  • The project of a company located on the YMX International Aerocity of Mirabel site consists of expanding an existing building to meet new production and administrative space requirements. The structure will have an above-ground height of approximately 15 m and a surface area of approximately 13,562 sq. m. The building's exterior envelope will be made of materials similar to those of the existing building and the roof will be covered with a white membrane identical to the existing one to ...

Project Saint John Airport Wastewater Treatment Facility Upgrades

  • Location (Saint John Airport Wastewater Treatment Facility Upgrades, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80742
  • Last Modified: 2020-06-30
  • The project consists of upgrading an aging wastewater treatment facility. The upgrades will include switching the facility from a chlorination disinfection system to a UV disinfection system, and will allow the new facility to process 170 cubic meters of wastewater per day, up from 105. More specifically, the project scope includes: - wastewater lift station, - 2 pump stations, and - 1 wastewater treatment plant The project will benefit the public by ensuring that wastewater effluent standards ...

Project Fraser Grain Terminal - Grain Export Facility - Project Permit No. 15-041-05 - Amendment (Condition 36 - Extended Hours)

  • Location (Fraser Grain Terminal - Grain Export Facility - Project Permit No. 15-041-05 - Amendment (Condition 36 - Extended Hours), British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80815
  • Last Modified: 2020-06-29
  • Fraser Grain Terminal Ltd. (the Permit Holder) proposes to carry out physical activities related to the filling and settling of the grain storage bins, as part of the construction of the Fraser Grain Terminal Grain Export Facility, continuously (24 hours, 7 days a week) for approximately 8 weeks in the period from August 31, 2020 to October 25, 2020. The Permit Holder also proposes to carry out physical activities related to the installation of the final utility protection slab and completion ...

Project Lynn Lake Gold Project

  • Location (Lynn Lake, Manitoba)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80140
  • Last Modified: 2020-06-29
  • Alamos Gold Inc. is proposing the construction, operation, decommissioning, and reclamation of an open pit gold mine and new metal mill located approximately 1000 kilometres north of Winnipeg, near Lynn Lake, Manitoba. The Lynn Lake Gold Project would involve the redevelopment of two historical gold mines (the Gordon site and MacLellan site) and have an ore input capacity of 8,000 tonnes per day over an 11-year period. Components of the project would include new mine infrastructure, ...

Project Grassy Mountain Coal Project

  • Location (Southwest Alberta, approximately 7 kilometres north of Blairmore, Alberta)
  • Assessment Type: Environmental assessment by Review Panel under CEAA 2012
  • Status: In progress
  • Reference Number: 80101
  • Last Modified: 2020-06-29
  • Benga Mining Limited, a wholly owned subsidiary of Riversdale Resources Limited, is proposing to construct and operate an open-pit metallurgical coal mine near the Crowsnest Pass, approximately seven kilometres north of the community of Blairmore, in southwest Alberta. As proposed, the production capacity of the project would be a maximum of 4.5 million tonnes of clean coal per year, over a mine-life of about 25 years.

Project Lake Superior National Marine Conservation Area Discovery Centre

  • Location (Lake Superior National Marine Conservation Area, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80812
  • Last Modified: 2020-06-29
  • This project will involve construction of the Lake Superior National Marine Conservation Area Discovery Centre in Nipigon, ON. The project site is a 1.4-hectare lot at the Nipigon waterfront on the west side of Brennan Drive. The project will include construction of the Discovery Centre, detached garage, parking area, outdoor interpretive elements, and landscaping. The Discovery Centre (approximately 1,300 square meters) will be a single-story, multiuse building that will include exhibit space, ...

Project Atikameksheng By-Pass Road Construction

  • Location (Naughton, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80738
  • Last Modified: 2020-06-29
  • The Project involves the construction of approximately 5 kilometres of a new by-pass road (approximately 3 kilometres of gravel and 2 kilometres of asphalt overlay) through undisturbed rock and forest. The Project scope will include the construction of an approximately 30 metre span rip-rap stone causeway to cross a wetland area along new road. The construction of the by-pass road will be an alternative travel route for improved safety of residents and improves access to the community. It will ...

Project Reconstruction of Nawash Unceded First Nation Roads and Culverts

  • Location (Neyaashiinigmiig, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80739
  • Last Modified: 2020-06-29
  •   The project will replace 23 culverts and reconstruct and resurface sections of roads in Chippewas of Nawash First Nation, Ontario. A total of 15 crossing culverts and 8 driveway culverts will be replaced and possibly upsized, which will also include cleaning out and regrading ditches, applying measures to prevent erosion of drainage inlets and outlets, relocating utilities, and reconstructing (2000 square metres) and resurfacing (400 square metres) sections of roads. The project will ...

Project Paudash Street Reconstruction

  • Location (Hiawatha, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80737
  • Last Modified: 2020-06-29
  • The project will rehabilitate approximately two-kilometres of Paudash Street between Cowe Street and Lakeshore Road in Hiawatha, Ontario. More specifically the project work will consist of regrading the gravel shoulders; improving drainage by replacing 30 culverts underneath the road and installing a 200 metre perforated high-density sub-drain on the north side; and resurfacing the road with asphalt. A new, two-kilometre, multi-use pathway will also be installed along the north side of the ...

Project Gull Bay Roads Rehabilitation

  • Location (Neebing, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80744
  • Last Modified: 2020-06-29
  • The project will reconstruct approximately a combined total of 10 kilometres of contiguous roads on reserve including improvements or relocation of the entrance to Highway 527. The work includes resurfacing and grading, widening of roadway sections, brush clearing, ditching, sightline improvements, regulatory and warning signs, installation of approximately 43 culverts and drainage modifications.

Project Upgrading of Roadways in Beausoleil First Nation

  • Location (Beausoleil First Nation Reserve, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80721
  • Last Modified: 2020-06-29
  • The project will upgrade approximately 17.2 kilometres of roadway in Beausoleil, Ontario. The upgrades will involve the installation of sidewalks and a ditching system, rehabilitation of the sub-grade, and asphalt surfacing of the roadway and shoulders from O-Gema Road to Kate Kegwin Road (0.35 kilometres), with the remaining roads and shoulders (16.85 kilometres) paved with a double surface treatment. The project will improve road safety and reliability for drivers, cyclists and pedestrians, ...

Project Cavendish Campground Staff Room Construction

  • Location (Prince Edward Island National Park, Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80735
  • Last Modified: 2020-06-28
  • The previous Cavendish Campground Staff Room experienced a devastating fire last fall and, as such, burned beyond repair. National park staff now require a lunchroom, wash up area and bathroom for their daily personal needs. Site design and drawings have been completed and the new site for the staff room has been designated within the rehabilitated dumping station for Cavendish Campground. The new staff room will be situated in the northeast corner of the former dumping station site. It will ...

Project Lower Nicola Indian Band Community Solar Gardens

  • Location (Lower Nicola Reserve Lands - Nicola Mameet No. 1, Joeyaska No. 2, and Zoht No. 4, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80727
  • Last Modified: 2020-06-28
  • The Proponent (Lower Nicola Indian Band, LNIB) intends to install solar photovoltaic (PV) panels on key First Nation community and residential buildings in Lower Nicola, BC. The Lower Nicola Indian Band Community Solar Gardens Project (the Project) will involve the installation of solar panels on or near 16 buildings across three reserve lands, including the Shulus Arena, LNIB Health Building, LNIB Fire Hall, LNIB Social Housing Rentals, Rocky Pines Community Centre, Administration Building, ...

Project Rideau River Eastern Pathway "Stanley Avenue Missing Link" - Proposed Multi-use Pathway

  • Location (Ottawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80724
  • Last Modified: 2020-06-27
  • Project summary, including how the NCC is involved : The City of Ottawa is proposing to close the pre-existing gap in the multi-use pathway between the south limit of Stanley Avenue and the north side of the New Edinburgh Park playground (where the pathway transitions to/from mixed traffic) with the addition of a new segment of multi-use pathway. The proposed design considers land ownership and land use, the existing corridor esthetics, safety and affordability in providing an enhanced ...

Project Trans Northern Pipeline Integrity Digs

  • Location (Rouge National Urban Park, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80729
  • Last Modified: 2020-06-27
  • Maintenance of 40 year old pipeline owned by Trans-Northern Pipeline (TNPI) is required at four locations within Rouge National Urban Park. This pipeline delivers refined petroleum products, including gasoline, diesel and aviation fuel to service airports and businesses throughout Ontario. The maintenance required, known as integrity digs, involve exposing an area of compromised pipe via open cut (excavation) and conducting in-situ detailed inspection and repairs. The temporary work space ...

Project Replacement of the Fuel Transfer Station and Fuel Tank Systems

  • Location (17 Wing Detachment Dundurn, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80811
  • Last Modified: 2020-06-26
  • 17 Wing Detachment Dundurn will replace its existing fuel transfer station in the summer of 2020 to address compliance, operational and site deficiencies. The proposed project will consist of constructing a new fuel transfer station as well as decommissioning the existing one. The replacement station will include two aboveground fuel storage tank systems for gasoline and diesel, an access road and product transfer areas. Decommissioning of the current fuel transfer station consists of a ...

Project Fenceline Replacement - Prince Albert Training Area, Saskatchewan

  • Location (DND Prince Albert Training Area, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80810
  • Last Modified: 2020-06-26
  • This project comprises of the replacement of 7.5 kilometres of new wire fence, three (3) metres inside the Department of National Defence (DND) property line, around the entire perimeter of the Prince Albert Training Area, located two (2) kilometres north of Prince Albert, Saskatchewan. The project is a response to the existing fence being damaged and removed in sections. Trespassers have used the area for recreational purposes, posing a safety risk to themselves and a security and safety risk ...

Project Wunnumin Lake First Nation Teacherages Project

  • Location (Wunnumin Lake First Nation, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80809
  • Last Modified: 2020-06-26
  • The Wunnumin Lake First Nation Teacherage project will include the construction of two new Teacherage Duplexes and renovation of the existing Teacherages. The Duplex Construction includes construction of two 149 m2 woodframe buildings with PWF crawlspace foundation with wood/electric heat. The units will be located on undeveloped lots; however, the lots have been identified as part of WLFN subdivision design. Servicing will include extension of the hydro lines, water servicing from the Duplexes ...

Project On hold - Muskowekwan Wind Farm Project

  • Location (Muskowekwan Indian Reserve 85-43, 85-49, 85-50, 85-63, 85-64, 85-65, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80525
  • Last Modified: 2020-06-26
  • As Independent Power Producer, Wood Wind Canada Ltd. aims at developing, designing, installing, operating and maintaining a wind farm to be dispatched to the national electrical grid. The approximate nominal power capacity of 126 MW comprising 21 wind turbines with an output in the range of 6.0 MW each, rotor diameter of approx. 170 m and hub height of approx. 115 mT.   The green field plant will be located in the Muskowekwan First Nation territories and will cover an area of approx. ...

Project On hold - Piapot Wind Farm Project

  • Location (Piapot Indian Reserve 75, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80523
  • Last Modified: 2020-06-26
  • As Independent Power Producer, Wood Wind Canada Ltd. aims at developing, designing, installing, operating and maintaining a wind farm to be dispatched to the national electrical grid. The approximate nominal power capacity of 150 MW comprising 25 wind turbines with an output in the range of 6.0 MW each, rotor diameter of approx. 170 m and hub height of approx. 115 mT. The green field plant will be located in the Piapot First Nation territories and will cover an area of approx. 3700 ha ...

Project On hold - Ocean Man First Nation 1 MW Solar Project

  • Location (Ocean Man IR 69I, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80630
  • Last Modified: 2020-06-26
  • The proponent has been accepted under SaskPower's Power Generation Partner Program to supply solar electricity to the power grid. The overall project consists of constructing a steel pile structure in the ground with steel racking above ground to accommodate fixed solar panels.  The panels are expected to be approximately 10 feet high and situated approximately 2 feet off the ground.  Site1 (NE 32-10-7 W2M) is 1.38 hectares in size containing 900 panels for 280kw of solar ...

Project Wallace Bay National Wildlife Area, Nova Scotia - Proposed restoration of freshwater wetland segment Wallace Bay 3.

  • Location (Wallace Bay National Wildlife Area, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80808
  • Last Modified: 2020-06-26
  • Ducks Unlimited Canada is proposing to undertake a restoration of constructed wetland infrastructure located at the Wallace Bay National Wildlife Area. The scope of this project includes mechanical breach failed / eroding dyke within segment Wallace Bay 3. The proposed work will be completed during fall /  winter  and during a period when disturbance to migratory birds and other wildlife will be minimal. All necessary measures to address potential siltation will be employed, ...

Project SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake

  • Location (Prince Albert National Park, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80722
  • Last Modified: 2020-06-26
  • SaskPower is proposing to salvage a two-pole structure that is severely decayed and replace it with a new single-pole double deadend structure. Once replaced, guy-wires and screw-style anchors will be installed to support the poles. To access the project location, SaskPower requires that the vegetation and regenerating trees/shrubs along the existing easement be cleared. The vegetation clearing will take place along the existing overhead power easement for a distance of approximately 950 metres ...

Project Hay Camp Road (km 20) Culvert Replacement, Wood Buffalo National Park

  • Location (Wood Buffalo National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80805
  • Last Modified: 2020-06-25
  • The large lake to the west will be temporarily held back with a dam, road area will be de-watered with a screened intake hose and fish salvage will occur. Road will be excavated (approximately 35 ft across and 80 ft wide, old culvert will be removed and new installed. Road bed fill repacked, compaction tests, graveled and riprap placed on either ditch to prevent erosion and sediment entering the water.

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Assessment Status Display Filters

Date modified: