Town of Shelburne Long-Term Well Project
Town of Shelburne Long-Term Well Project
Shelburne (ON)
Status: On September 2, 2011, the Canadian Environmental Assessment Agency received an acceptable project description and is now determining if a comprehensive study should commence.
About the Project: The Town of Shelburne is proposing to develop a new water supply production well. The proposed well site is located approximately 3 kilometres west of the Town of Shelburne on 2nd Line southwest. The proposal consists of conveying groundwater from the proposed well site via a water main constructed for the project along existing right-of-ways to a connection with the existing water supply system infrastructure. The proposed water main route is approximately 4 kilometres in length, following 2nd Line southeast to Highway 89, then continuing eastwards along Highway 89 until connecting with the Town of Shelburne's existing water supply system.
Proponent: The Town of Shelburne
Document reference number: 11