November 13, 2026 – As part of its Project and Environmental Review process, the Vancouver Fraser Port Authority must determine whether the proposed New dock installation – 2820 Panorama Drive, located at 1440 Columbia Street, North Vancouver, are likely to cause significant adverse environmental effects. 

To help inform this determination and a decision on whether or not to approve the proposed project, the Vancouver Fraser Port Authority is inviting comments from the public respecting that determination. All comments received will be considered public and may be posted online.  For more information, individuals should consult the Privacy Notice on the Registry website. In addition, your contact information may be shared with third parties, e.g., the tenant, other relevant agencies, to help respond to your questions and inform possible mitigations.

Written comments must be submitted by December 12, 2026 to:

Vancouver Fraser Port Authority
Project and Environmental Review
100 The Pointe, 999 Canada Place
Vancouver, B.C. Canada V6C 3T4
per@portvancouver.com

The proposed project

The upland owner of the property located at 2820 Panorama Drive is proposing to install a new private residential dock in Deep Cove, North Vancouver. The Project consists of the installation of a prefabricated dock including an aluminum gangway and ramp and a rectangular float in the water. The gangway would sit on a concrete sill on the upland and supported by four steel piles on the foreshore and the float would be held in place in the water by two steel piles.

The six piles would be installed using a vibratory hammer on a floating barge. The gangway, ramp and mooring float will be constructed off site at an upland location, transported to the site by water and installed using a crane/davit on a floating barge/vessel. Depending on engineering requirements and site conditions, pile installation equipment may include: vibratory hammer, drop hammer, power hammer, rocket socket for drilling and cleaning machinery. The concrete sill would be constructed using hand-operated equipment

Construction would be conducted from land and water and is anticipated to be conducted during regular work hours, over a duration of approximately 4 months.

Document reference number: 1