Sault Ste. Marie Perimeter Fence Installation
Public Comment Period on Intent to Make a Determination
Sault Ste. Marie Perimeter Fence Installation
November 2, 2026 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects.
To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more information, individuals should consult the Privacy Notice on the Registry website.
Written comments must be submitted by November 21, 2026 to:
Salim Al Khodari, Engineering Project Manager
Mailing Address: 1 Yukon Lane
Toronto, ON, Canada, M3K 0A1
E-mail: salim.alkhodari@forces.gc.ca
The Proposed Project
The Department of National Defence (DND) is proposing to upgrade the perimeter security infrastructure at the Sault Ste. Marie Armoury through the installation of new perimeter fencing and access gates. The proposed fence will generally follow the existing property boundary.
Construction activities will include vegetation clearing and grubbing, excavation, and the installation of fencing and barbed wire to maintain perimeter security.
Document reference number: 1