Replacement of the septic systems at Sites 3 and 4 at the Falls Lake Cottages and Campground, Canadian Forces Base (CFB) Halifax
Public Comment Period on Intent to Make a Determination
Replacement of the septic systems at Sites 3 and 4 at the Falls Lake Cottages and Campground, Canadian Forces Base (CFB) Halifax
August 4, 2026 — Canadian Forces Morale and Welfare Services must decide whether the proposed project is likely to cause significant adverse environmental effects.
To help inform this decision, Canadian Forces Morale and Welfare Services is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more information, individuals should consult the Privacy Notice on the Registry website.
Written comments must be submitted by August 23, 2026 to:
Mike Almond, Senior manager
Mailing Address: PO Box 99000 Stn Forces
Halifax, Nova-Scotia, B3K 5X5
E-mail: mike.almond@forces.gc.ca
or
Natalia Melnik, Senior Environmental Policy and Program Manager
Canadian Forces Morale & Welfare Services
E-mail: melnik.natalia@cfmws.com
The Proposed Project
Canadian Forces Morale and Welfare Services (CFMWS) is proposing a project. CFMWS is proposing the replacement of aging septic systems at Sites 3 and 4 of the Falls Lake Cottages and Campground, Canadian Forces Base (CFB) Halifax, due to the end of their service life. The project is intended to maintain reliable wastewater management infrastructure and support the continued operation of the campground facilities. The existing septic tank at Site 3 is located approximately 62 ft (18.9 m) from the water's edge, while the existing septic tanks at Site 4 are located approximately 96 ft (29.3 m) from the water's edge. The project will occur on previously developed land and will involve the replacement of the existing pump chambers at both Sites 3 and 4, while the existing septic tanks will remain in place. In addition, an extra septic chamber will be installed at Site 4 to increase system capacity. Construction activities may include excavation, installation of prefabricated components, trenching for new or existing utilities, and tie-ins to communications, water, sanitary, and electrical infrastructure, as required. Construction is anticipated to occur in late fall 2026. The project will result in an increase in wastewater system capacity through the addition and replacement of septic chambers; however, it will not involve a change in land use, campground footprint, or the overall function of the site.
Document reference number: 1