Sikh-E-Dakh (Glen Vowell Band) - Sik-E-Dakh Wastewater System
Sikh-E-Dakh (Glen Vowell Band) - Sik-E-Dakh Wastewater System
Notice of determination
July 21, 2026 – Fisheries and Oceans Canada (DFO) has determined that the project is not likely to cause significant adverse environmental impacts.
The determination was based on a consideration of the following factors:
- Impacts on rights of Indigenous peoples;
- Community knowledge;
- Comments received from the public; and
- Technically feasible mitigation measures.
For the riverine outfall of the Sik-E-Dakh Wastewater System, the implementation of mitigation measures is required for the project to reduce impacts to fish and fish habitat. Mitigation measures include:
- Limit aquatic and riparian disturbance areas to the extent possible.
- Restore all disturbed riparian and aquatic areas.
- Work during the winter low flow season.
- Complete works in-the-dry to the extent possible.
- Minimize the duration of instream works.
- Conduct full time environmental monitoring.
- Fully remove all temporary materials from below the High Water Mark of the Skeena River.
- Avoid trapping or stranding fish.
- Implement fish deterrent and/or salvage measures in in-water work areas.
- Install erosion and sediment controls in advance of works, and monitor them for effectiveness.
- Prepare a spill response plan in advance of works. Ensure sufficient emergency spill response supplies are readily available on site.
DFO – FFHPP is satisfied that the carrying out of the project is not likely to cause significant adverse environmental effects.
Therefore, DFO – FFHPP may exercise its power, duty or function (issuance of a Fisheries Act authorization).
Document reference number: 3