Buffalo River Dene Nation Stage 5 Subdivision
Public Notice
Notice of intent to make a determination
Buffalo River Dene Nation Stage 5 Subdivision – Public Comments Invited
July 21, 2026 – Indigenous Services Canada must determine whether the Buffalo River Dene Nation Stage 5 Subdivision project is likely to cause significant adverse environmental effects. To help inform this determination, Indigenous Services Canada is inviting comments from the public respecting that determination.
Written comments must be submitted by August 21, 2026 to:
Indigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Email: isc-skenv@sac-isc.gc.ca
The Proposed Project
The Buffalo River Dene Nation is proposing to construct a new subdivision to meet the community's need for current and future housing units. The proposed Stage 5 subdivision will provide up to 50 new lots and will occupy approximately 15 hectares of forested land. New infrastructure required as part of the subdivision includes high density polyethylene (HDPE) water main pipeline, polyvinyl chloride (PVC) sewer main pipeline and manholes, water and sewer service lines, hydrants, roadways and drainage culverts, power and phone utilities.
Clearing and grubbing of the site is proposed to occur in the fall or winter to avoid the risk of harming migratory nesting birds. The extent of vegetation clearing will be kept to the minimum amount necessary to construct the new subdivision and to provide a fire break. Activities during construction include primary earthworks, new utility installation, sub grade construction, ditch construction, grading and landscaping.
Document reference number: 1