One Arrow First Nation Road Upgrades
Public Notice
Notice of intent to make a determination
One Arrow First Nation Road Upgrades – Public Comments Invited
June 8, 2026 – Indigenous Services Canada must determine whether the proposed One Arrow First Nation Road Upgrades project is likely to cause significant adverse environmental effects. To help inform this determination, Indigenous Services Canada is inviting comments from the public respecting that determination.
Written comments must be submitted by July 8, 2026 to:
Indigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Email: isc-skenv@sac-isc.gc.ca
The Proposed Project
One Arrow First Nation is proposing the upgrade of existing roadway infrastructure throughout the community, including main access roads, the core area, subdivision roads, and rural residential roadways. The project will also include ditch grading improvements, as required, in areas where roadway drainage has been identified as insufficient.
Site preparation activities will include stripping topsoil within roadway right of ways where ditching upgrades will be completed. Construction activities will consist of excavating and filling existing roadway surfacing to design elevations, preparing subgrade materials, and application of aggregate and surfacing materials to the road surface. Ditching will be excavated to design elevations, followed by topsoil replacement and seeding.
Document reference number: 1