Public Notice

Expansion of Storage Courtyard – Public Comments Invited

April 9, 2026 – The authorities must determine whether the proposed Expansion of Storage Courtyard, located at Warner Building is likely to cause significant adverse environmental effects.

To help inform this determination, the authorities are inviting comments from the public respecting that determination. All comments received will be considered public and may be posted online.

Written comments must be submitted by May 10, 2026 to:

Environment, Health and Safety

Public Services and Procurement Canada

11 Laurier St, Portage III, Place du Portage
Gatineau, QC  K1A 0S5

Email: TPSGC.RCNLVEEListedeControle-NCRECMPChecklist.PWGSC@tpsgc-pwgsc.gc.ca

 

The Proposed Project

This project will remove the soil berm behind the building to create a flat, level surface that matches the surrounding ground. Once the area is graded, it will be paved with asphalt to provide additional outdoor storage space. The current paved area is about 6,396 m², and the expansion will add another 1,282 m², for a total improved area of 7,679 m².

Some trees within the work area will need to be removed. Because tree clearing is planned for summer or fall, a qualified professional will complete a nesting bird survey before any vegetation is taken down. This is required to protect migratory birds under federal and provincial regulations. No tree replanting is currently included in the project, but this may be discussed with stakeholders as the project advances.

The project will use the site's existing drainage system. A stormwater review has already been completed, and the City of Ottawa has confirmed that the current drainage conditions can support the proposed expansion.

Document reference number: 1

Date modified: