Notice of Termination of Assessment

 

November 24, 2025 - Determination of environmental effects of the proposed Replacement of Bridge for Winter Road Crossin on Eabametoong First Nation is no longer required as the Environmental Impact Assessment has been cancelled.

Document reference number: 2

Date modified: