Site C Clean Energy Project
Annual Reports - 2023
- 2023 Annual Report – Air Quality Management Plan (PDF – 8.7 MB)
- Aboriginal Group Communication Plan 2023-2024 Annual Report (PDF – 289 KB)
- Aboriginal Plant Use Mitigation Plan 2023-2024 Annual Report (PDF – 265 KB)
- Aboriginal Training and Inclusion Plan 2023-2024 Annual Report (PDF – 286 KB)
- Accidents and Malfunctions Plan Annual Update: 2023 (PDF – 965 KB)
- Acid Rock Drainage and Metal Leachate Management Plan – Water Quality Annual Report: January 1 to December 31, 2023 (PDF – 444 KB)
- Appendix A – Site C Clean Energy Project Acid Rock Drainage and Metal Leachate Management Plan 2023 Annual Montoring Report (Lorax Environmental)
- Appendix B – PAG Contact RSEM Pond Monitoring: Peace River Surface Water Quality and Pond Toxicity 2023 Annual Report (Ecofish Research Ltd. And ASKI Reclamation LP)
- Appendix C – Site C Clean Energy Project Water Quality Monitoring for River Road, South Bank Initial Access Road, Left Bank Debris Boom and L2 Powerhouse 2023 Annual Report (Tetra Tech)
- Cultural Resources Mitigation Plan 2023-2024 Annual Report (PDF – 233 KB)
- Fisheries and Aquatic Habitat Management Plan Annual Report: Jan 1, 2022 to Dec 31, 2023 (PDF – 288 KB)
- Vegetation and Wildlife Mitigation and monitoring Plan 2023 Annual Report (PDF – 39.8 MB)
- Vegetation and Wildlife Mitigation and Monitoring Plan 2023 Annual Report Appendices 7-14 (PDF – 36.2 MB)
Document reference number: 2874