Notice of Determination

Lewisporte- 07.31.2025 – The Royal Canadian Mounted Police has/have determined that the proposed project is not likely to cause significant adverse environmental effects.

This determination was based on a consideration of the following factors:

  • impacts that the project may have on the rights of Indigenous peoples;
  • Indigenous knowledge provided with respect to the project;
  • community knowledge provided with respect to the project;
  • comments received from the public; and
  • the mitigation measures that are technically and economically feasible and that would mitigate any significant adverse environmental effects of the project that the Royal Canadian Mounted Police is satisfied with will be implemented.

Mitigation measures taken into account for this determination relate to:

  • Soil Erosion and Sediment Control: Mitigation measures to minimize erosion and control sediment include, but are not limited to, developing an Erosion and Sediment Control Plan for site as required; catch basin protection installation for open grate manholes and curb drains, sediment surrounding the basins will be removed, and catch basins and area will be inspected after major precipitation events and storms.
  • Dust: Mitigation measures to control dust include but are not limited to, covering or wetting down dry materials and rubbish to prevent blowing dust and debris; provide windbreaks to reduce blowing dust.
  • Migratory birds: Mitigation measures pertaining to the protection of migratory birds and their habitat include, but are not limited to contractor compliance with the Migratory Birds Convention Act (MBCA), 1994 and the Species at Risk Act Climate Change Canada (ECCC) for treed and open habitats in the current zone such that no damage to active nests of (SARA); no clearing of vegetation should be undertaken during the core nesting windows established by Environment and migratory birds protected under the MBCA will occur.
  • Hazardous Substance Spills or Releases: Spill response plan to be implemented with mitigation measures that include but are not limited to: having spill kit on site, storage of substances, restricted access where required, document noting appropriate contact numbers, designated fueling and materials storage areas, and daily tail gate meetings as required

The above list of standard mitigation measures for each value component identified, but is not an exhaustive list of all mitigation measures that may be implemented.

The Royal Canadian Mounted Police is satisfied that the carrying out of the project is not likely to cause significant adverse environmental effects.

Therefore, the Royal Canadian Mounted Police may carry out the project, exercise any power, perform any duty or function, or provide financial assistance to enable the project to be carried out in whole or in part.

Document reference number: 2