The Royal Canadian Mounted Police must determine whether the proposed Montreal Lake RCMP New Detachment, located in Montreal Lake, is likely to cause significant adverse environmental effects.

To help inform this determination, the Royal Canadian Mounted Police is inviting comments from the public respecting that determination. All comments received will be considered public. For more information, individuals should consult the Privacy Notice on the Registry website.

Written comments must be submitted by 29 July 2025 to:

Royal Canadian Mounted Police

6101 Dewdney Ave W, Regina SK, S4P 3K7

NtlEnvironmentalProgram-ProgrammeEnvironmentalNtl@rcmp-grc.gc.ca 

The Proposed Project

The primary objective of this project is to build a new modular detachment on leased land in Montreal Lake, SK. The project scope includes design and construction of a 761 m2 detachment building including all specifications, rooms, and functional areas required. The construction phase is estimated at approximately 24 months including site works, construction and commissioning, plus an additional 2 months for fit up. Occupancy is expected in early 2028. Site construction is to be completed on current non developed land. Mitigation measures will be utilized to confirm no impacts to the environment, including a wildlife and ecological on-site survey.

Document reference number: 1