Bank stabilization at Latchford dam – Public Comments Invited
January 9, 2025 – The authority must determine whether the proposed Bank stabilization at Latchford dam, located in Latchford, ON is likely to cause significant adverse environmental effects.
To help inform this determination, the authority is inviting comments from the public respecting that determination. All comments received will be considered public and may be posted online.
Written comments must be submitted by February 9, 2025 to:
Environment, Health and Safety
Public Services and Procurement Canada
11 Laurier St, Portage III, Place du Portage
Gatineau, QC K1A 0S5
Email: TPSGC.RCNLVEEListedeControle-NCRECMPChecklist.PWGSC@tpsgc-pwgsc.gc.ca
The Proposed Project
This project involves engineered reinstatement and careful placement of material that was lost recently due to erosion. This will ensure the bank is stabilized and can withstand further erosive forces. The work will require in-water placement of aggregate material with the use of heavy machinery as well as replacement and adjustment of filter cloth.