Pine Creek and Ebb and Flow - Anishinaabe Aki Petro-Can Gas Bar in Dauphin, MB - 2425
The purpose of this project is to facilitate the construction of the Anishinaabe Aki Petro-Can Gas Bar in the community of Dauphin, MB on Pine Creek First Nation and Ebb and Flow First Nation Joint Reserve Land. 425m2
Physical works broken into two phases:
Phase I - Petroleum equipment supply/install; Civil site works commencement and municipal connection with sewer, water, and storm drainage systems and Manitoba Transportation and Infrastructure.
Phase II - Gas Station/Convenience Store/Drive-thru coffee shop; civil site works final grading and paving. Costs for construction phase II works will be requested once final building drawings and specifications are completed.
Infrastructure: Graded lots, drainage, and parking lot construction, overhead power lines, water and sewer services.
Document reference number: 1