Public Notice

Hard Surface Replacement – Public Comments Invited

June 29, 2022 – The authority must determine whether the proposed Hard Surface Replacement, located in Sudbury, Ontario is likely to cause significant adverse environmental effects.

To help inform this determination, the authority is inviting comments from the public respecting that determination. All comments received will be considered public and may be posted online.

Written comments must be submitted by July 29, 2022 to:

Public Services and Procurement Canada
Joseph Nguyen, Environmental Specialist
4900 Yonge Street
Toronto, Ontario M2N 6A6
Telephone: 437-992-4353
Email: Joseph.Nguyen@pwgsc-tpsgc.gc.ca

 

The Proposed Project

Replace the existing interlocking and damaged concrete on the sidewalks, curbs and walkways. Addition of a ramp that is compliant with AODA requirements. New layout of the MI parking lot to improve barrier-free accessibility and increase the number of parking spaces involving repainting of parking lines and some repaving. Through the preliminary design phase of this project, it was determined that the footprint of the above noted areas exceeded 1,000m2 (Approximately 1240m2 for paved walkways, approximately 1700m2 for interlocking paving, and approximately 3800m2 for barrier free parking areas).

Document Reference Number: 1

Date modified: