The Royal Canadian Mounted Police must determine whether the proposed CPC West Parking Lots & Roadway Replacement - Phase 5 and 6, located in Ottawa, is likely to cause significant adverse environmental effects.

To help inform this determination, the Royal Canadian Mounted Police is inviting comments from the public respecting that determination. All comments received will be considered public. For more information, individuals should consult the Privacy Notice on the Registry website.

Written comments must be submitted by 20 January 2022 to:

Royal Canadian Mounted Police

73 Leikin Drive, Ottawa, ON, K1A 0R2

NtlEnvironmentalProgram-ProgrammeEnvironmentalNtl@rcmpgrc.gc.ca

The Proposed Project

The project scope involves design services, construction drawings and construction administration services related to Parking Lots, Walkways and Roadway replacement at the RCMP Campus - 1 Sandridge Rd. Ottawa, Ontario. Complete removal of existing asphalt pavement roadway and walkway, and removal of concrete curbs. Full reinstatement of the asphalt pavement roadway and walkway surfaces, new Granular A and Granular B to required levels, new catch basins and the reinstatement of all concrete curbs, as required.      

Document Reference Number: 1

Date modified: