Camp Canada Power Distribution Upgrade, Operation IMPACT - Camp Canada, Ali Al-Salem Air Base, Kuwait
Public Comment Period on Intent to Make a Determination
Camp Canada Power Distribution Upgrade, Operation IMPACT - Camp Canada, Ali Al-Salem Air Base, Kuwait
December 8, 2021 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects.
To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more information, individuals should consult the Privacy Notice on the Registry website.
Written comments must be submitted by December 17, 2021 to:
Gaston Villemure, Environmental Engineer
Mailing Address: Canadian Joint Operations Command, 101 Colonel By Drive
Ottawa, ON, Canada, K1A 0K2
E-mail: Gaston.Villemure@forces.gc.ca
The Proposed Project
The Canadian Task Force on Operation IMPACT in Kuwait will upgrade the power distribution network at Camp Canada. This will include the construction of a Primary Distribution Unit, Secondary Distribution Unit , and Tertiary Distribution Unit, the installation of the electrical distribution lines necessary to tie into the existing power grids. All of this will require excavation and preparation of the ground for trenches and cable runs.
Document reference number: 1