Detailed Engineering Optimizations
- From Greenstone Gold to the Impact Assessment Agency of Canada re: Detailed Engineering Optimizations (October 9, 2019) (PDF – 0.1 MB)
- Hardrock Project Outcome of Detailed Engineering Design Optimizations (PDF – 7.9 MB)
- Optimization Report - Table 2-1 Addendum (PDF – 0.2 MB)
- Design Optimization Report Follow-up - Summary of Consultation with Stakeholders (May 1, 2020) (PDF – 0.4 MB)
- From Greenstone Gold Mines to the Impact Assessment Agency of Canada re: Response to Letter from IAAC dated September 25, 2020 (October 22, 2020) (PDF – 1.6 MB)
Document Reference Number: 38