Notice of Referral to a Review Panel

Kitimat Clean Refinery Project
Kitimat B.C.

September 9, 2016 — The Honourable Catherine McKenna, Minister of Environment and Climate Change, has referred the environmental assessment of the proposed Kitimat Clean Refinery Project to a review panel under section 38 of the Canadian Environmental Assessment Act, 2012.

Kitimat Clean Ltd. is proposing the construction, operation, decommissioning and abandonment of a new oil refinery located approximately 13 kilometres north of Kitimat, British Columbia. As proposed, the Kitimat Clean Refinery Project would include a refinery, a power-plant, a rail yard, a marine terminal and a bitumen storage facility. A new pipeline would also be constructed to deliver fuel to the proposed marine terminal, located approximately 12 kilometres south of Kitimat. The project is expected to process approximately 400,000 barrels of bitumen per day over a lifespan of at least 50 years.

For further information on this environmental assessment, please visit the project page at www.canada.ca/en/environmental-assessment-agency.html, reference number 80125 or contact:

Kitimat Clean Refinery Project
Canadian Environmental Assessment Agency
160 Elgin Street, 22nd floor
Ottawa ON K1A 0H3
Telephone: 613-957-0700 or 1-866-582-1884
Email: KitimatCleanRefinery@ceaa.gc.ca

Document Reference Number: 10

Date modified: