Public Notice
Arctos Anthracite Project – Public Comments Invited

April 15, 2013

Requirement for a Federal Environmental Assessment

As part of the strengthened and modernized Canadian Environmental Assessment Act, 2012 (CEAA 2012) put in place to support the government's Responsible Resource Development Initiative, the Canadian Environmental Assessment Agency must decide whether a federal environmental assessment is required for the proposed Arctos Anthracite Project located in British Columbia (B.C.). To assist it in making its decision, the Agency is seeking comments from the public on the project and its potential effects on the environment.

The Proposed Project

Arctos Anthracite Joint Venture proposes the construction, operation and decommissioning of an anthracite coal mine in northwestern British Columbia. The site of the proposed mine is about 90 kilometres southeast of Iskut, 160 kilometres northeast of Stewart, and 240 kilometres north of Hazelton. The proposed project would produce about 3 million tonnes per year of anthracite coal over a mine life of approximately 25 years. It would also include constructing a 147 kilometre extension to an existing railway from its current terminus to the mine site.

Substitution Request

The Government of B.C. has requested that the federal Minister of the Environment (the Minister) approve the substitution of the B.C. environmental assessment process for the CEAA 2012 process if it is determined that an environmental assessment is required. The Agency is also seeking comments on this request.

In considering the Government of B.C.'s request, the Minister must be satisfied, under CEAA 2012, that:

  • the process to be substituted will include a consideration of the factors set out in subsection 19(1) of CEAA 2012;
  • the public will be given an opportunity to participate in the environmental assessment;
  • the public will have access to records in relation to the environmental assessment to enable their meaningful participation;
  • at the end of the environmental assessment, a report will be submitted to the Canadian Environmental Assessment Agency;
  • the report will be made available to the public; and
  • any other conditions that the Minister establishes are or will be met.

The Minister would also establish the following additional conditions for this project:

  • the involvement of expert federal departments in the B.C. process,
  • B.C. meeting the CEAA 2012 365-day time frame for completing the environmental assessment;
  • B.C. conducting procedural aspects of Aboriginal consultation; and
  • B.C. making available to Aboriginal groups funding provided by the Canadian Environmental Assessment Agency to support consultation during the substituted environmental assessment.

B.C.'s request is in accordance with a memorandum of understanding (MOU) between the Agency and the British Columbia Environmental Assessment Office to enable efficient and timely use of the CEAA 2012 substitution provisions. The MOU addresses the processes leading to substitution, the conduct of the substituted environmental assessment and associated Aboriginal consultation and the coordination of decision-making, monitoring and follow-up after the environmental assessment. The MOU and a Backgrounder on substitution under CEAA 2012 are available on the Agency's website.

Public Comments

Written comments on the need for a federal environmental assessment and on the substitution request must be submitted by May 6, 2013 to:

Arctos Anthracite Project
Canadian Environmental Assessment Agency
410 - 701 West Georgia Street
Vancouver BC V7Y 1C6
Telephone: 604-666-2431
Fax: 604-666-6990
Arctos@ceaa-acee.gc.ca

Map depicting the location of the project, as described in the current document.

All comments received will be considered public. To view a summary of the project description or for more information on the project, on the substitution request and on the environmental assessment process, visit the Agency's website(registry reference number 80040).

The Agency will post its decision on whether a federal environmental assessment is required on its website. A notice of the Minister's decision on the request for substitution will also be posted on the Agency's website if it is determined that a federal environmental assessment is required.

Document Reference Number: 1