Public Notice
Red Mountain Gold Mine Project — Public Comments Invited

November 12, 2015 — The Canadian Environmental Assessment Agency (the Agency) commenced a federal environmental assessment for the proposed Red Mountain Gold Mine Project, located approximately 18 kilometres northeast of Stewart, British Columbia.

The Agency invites the public to comment on which aspects of the environment may be affected by this project and what should be examined during the environmental assessment, as detailed in the draft Environmental Impact Statement (EIS) Guidelines. All comments received will be considered public.

Written comments must be submitted by December 12, 2015 to:

Red Mountain Gold Mine Project
Canadian Environmental Assessment Agency
410-701 West Georgia Street
Vancouver, BC  V7Y 1C6
Telephone: 604-666-2431
Fax: 604-666-6990
CEAA.RedMountain.ACEE@ceaa-acee.gc.ca

Map depicting the location of the project, as described in the current document.

To view the draft EIS Guidelines or for more information, visit the Agency's website (Registry reference number 80093).

Copies are also available at the following locations:

  • Stewart Public Library
    824 Main Street
    Stewart, B.C.
     
  • Gingolx Government
    607 Waterfront Street
    Gingolx, B.C.
     
  • Gitlaxt'aamiks Village Government
    5200 Skateen Drive
    Gitlaxt'aamiks, B.C.
     
  • Laxgalts'ap Community Center,
    Computer Lab
    441 Church Street
    Laxgalts'ap, B.C.
     
  • Gitwinksihlkw Village Government
    3004 Ts'oohl Ts'ap
    Gitwinksihlkw, B.C.
     
  • Hyder Public Library
    50 Main Street
    Hyder, Alaska
    United States

This is the second of four opportunities for the public to comment on this project. Following this comment period, the Agency will finalize and issue the EIS Guidelines to the proponent.

Projects subject to the Canadian Environmental Assessment Act, 2012 are assessed using a science-based approach.

The Proposed Project

IDM Mining Ltd. proposes to construct, operate and decommission an underground gold-silver mine located approximately 18 kilometres northeast of Stewart, British Columbia. As proposed, the Red Mountain Gold Mine Project would produce approximately 1000 tonnes of mineral ore per day and 275,000 tonnes per year, over an operational mine life of five to seven years.

Document Reference Number: 7

Date modified: