Public Notice
Milton Logistics Hub Project — Public Comments Invited

May 22, 2015 — As part of the strengthened and modernized Canadian Environmental Assessment Act, 2012 (CEAA 2012) put in place to support the government's Responsible Resource Development Initiative, the Canadian Environmental Assessment Agency (the Agency) commenced a federal environmental assessment for the proposed Milton Logistics Hub Project, located in Ontario.

The Agency invites the public to comment on which aspects of the environment may be affected by this project and what should be examined during the environmental assessment, as detailed in the draft Environmental Impact Statement (EIS) Guidelines.

Written comments must be submitted by June 21, 2015 to:

Milton Logistics Hub Project
Canadian Environmental Assessment Agency
55 St. Clair Avenue East, Suite 907
Toronto ON  M4T 1M2
Telephone: 416-952-1576
Fax: 416-952-1573
CEAA.LogisticsHub-PoleLogistique.ACEE@ceaa-acee.gc.ca

Map depicting the location of the project, as described in the current document.

To view the draft EIS Guidelines or for more information, visit the Agency's website (Registry reference number 80100).

Copies of the draft EIS Guidelines are also available for viewing at the following locations:

Milton Public Library – Main Branch
1010 Main Street East
Milton, Ontario

Burlington Public Library – Central Branch
2331 New Street
Burlington, Ontario

Oakville Public Library – Central Branch
120 Navy Street
Oakville, Ontario

Halton Hills Library – Georgetown Branch
9 Church Street
Georgetown, Ontario

Mississauga Public Library – Central Branch
301 Burnhamthorpe Rd. West
Mississauga, Ontario

Consistent with the transparency and public engagement elements of CEAA 2012, this is the second of four opportunities for the public to comment on this project. All comments received will be considered public.

Following this comment period, the Agency will finalize and issue the EIS Guidelines to the proponent. An application period for participant funding and a future public comment period on the proponent's EIS will be announced at later dates.

Projects subject to CEAA 2012 are assessed using a science-based approach. If the project is permitted to proceed to the next phase, it will continue to be subject to Canada's strong environmental laws, rigorous enforcement and follow-up, and fines for non-compliance.

The Proposed Project

The Canadian National Railway Company is proposing the construction and operation of a railway yard with more than 20 kilometres of track located in Milton, Ontario, about 50 kilometres west of Toronto.

Document Reference Number: 5

Date modified: