The environmental assessment for this project commenced on March 7, 2003 and was completed under the former Canadian Environmental Assessment Act.

The project involves the construction of a capped engineered containment facility (ECF) of about 7.5 ha, consisting of a peninsula attached to Hamilton Port Authority’s Pier 15. The ECF would cover in-situ about 130,000 m3 of contaminated sediments and contain about 500,000 m3 of dredged contaminated sediments from the surrounding areas.


Latest update

August 7, 2013 – The Decision of Responsible Authorities has been taken.

Participate

Contacts

Environment Canada
Harold Leadlay, Manager, Regional Programs and Liaison
351 St Joseph Blvd
Place Vincent Massey, 16th floor
Gatineau, Quebec K1A 0H3
Telephone: 819-953-1605
Fax: 819-953-4093
Email: harold.leadlay@ec.gc.ca


  • Location

    • Hamilton Harbour (Ontario)
  • Nature of Activity

    • Waste Management
  • Assessment Status

    Completed
  • Start Date

    2003-03-07
  • Proponent

    Environment Canada
  • Authorities

    • Environment Canada
    • Fisheries and Oceans Canada
    • Hamilton-Oshawa Port Authority
    • Transport Canada
  • Assessment Type

    Comprehensive study under CEAA 1992
  • Reference Number

    80001